For those of you who are interested - a letter explaining where they are in the current study. Members of the present Youth Coalition were involved in these meetings.
This is the text from the pdf which I can send out.
April 13, 2009
Dear Interested Resident:
Re: Notice of Completion – Proposed Toronto Hydro Lake Ontario Anemometer
MNR Class Environmental Assessment Process, Category B Project
Toronto Hydro Energy Services (TH Energy) has recently submitted an application to the Ontario Ministry of Natural
Resources (MNR) to conduct testing of wind resources in order to secure a Land Use Permit and an Application of
Record Status for Crown lands. The Land Use Permit and the Application of Record Status secure the right to use
the Crown Land area approved for exploration, on condition that all MNR requirements, including Environmental
Assessment (EA) requirements, are met. The TH Energy proposal is part of a two year exploration phase to
determine the potential economic viability for the development of a possible wind energy facility. The proposed
boundary of the Land Use Permit and the Application of Record Status is attached.
The Notice of Commencement
was previously issued on August 12 and 13, 2008.
TH Energy proposes to construct an anemometer platform to conduct the wind testing. An anemometer is a
miniature weather station that tests for wind speed, wind direction, temperature, humidity etc. An anemometer
platform is a stand-alone structure that would be affixed to the lake-bottom, with two small wind generators and a
solar photovoltaic (PV) panel to power the instruments. It is a temporary structure and will be removed after it has
served its purpose. The proposed structure has the following general dimensions/characteristics:
• A structural steel platform located in approximately 12.2 m of water extending from lake bottom to
approximately 4 m above lake water level;
• A width of approximately 5 m; and
• An anemometer instrument, auxiliary power system and navigation lights located atop this platform.
Additional project information is available on our website at the following address:
www.torontohydroenergy.com/offshorewind.
A Category B project evaluation and consultation process was carried out in accordance with the Class EA process
for MNR Resource Stewardship and Facility Development Projects, and it identified no significant adverse
environmental effects. As part of this Class EA process, consultation with the public was held at two separate
meetings (November/08 and January/09) in order to consult on the project with local stakeholders and other
interested parties. Further, a Project Evaluation Report was prepared in order to document the evaluation undertaken
and the consultation process carried out.
The Project Evaluation Report will be on public display for review and is available at the following locations during
normal business hours:
Toronto Hydro Corporation
14 Carlton Street
Toronto, ON
Phone: 416-542-3000
Ministry of Natural Resources
50 Bloomington Road West
Aurora, ON
Phone: 905-713-7386
Scarborough Civic Centre (Clerk’s Office)
150 Borough Drive, 3rd Floor
Toronto, ON
Phone: 416-396-7288
City of Pickering (Clerk’s Office)
One The Esplanade
Pickering, ON
Phone: 905-420-4660
Town of Ajax (Clerk’s Office)
65 Harwood Ave. S.
Ajax, ON
Phone: 905-683-4550
Port Union Library
Port Union Recreation Centre
5450 Lawrence Ave. East
Toronto, ON
Phone: 416-396-8885
Cliffcrest Library
Cliffcrest Plaza
3017 Kingston Road
Toronto, ON
Phone: 416-396-8916
Guildwood Library
Guildwood Plaza
123 Guildwood Parkway
Toronto, ON
Phone: 416-396-8872
Taylor Memorial Library
1440 Kingston Road
Toronto, ON
Phone: 416-396-8939
The public review period will commence on April 15, 2009 and continue for a period of 30-calendar days (ending
May 14, 2009). Interested persons may provide written comments to MNR or AECOM (acting on behalf of Toronto
Hydro) listed below within the review period.
Mark Patterson
Ministry of Natural Resources
50 Bloomington Road West
Aurora, Ontario L4G 3G8
Phone: 905-713-7386
Fax: 905-713-7361
E-mail: Mark.Patterson@mnr.gov.on.ca
Ian Dobrindt, MCIP, RPP, CCEP
AECOM
300 Town Centre Blvd, Suite 300
Markham, Ontario L3R 5Z6
Phone: 905-477-8400 x 213
Fax: 905-477-1456
E-mail: Ian.Dobrindt@aecom.com
Where there are outstanding concerns about this project that cannot be resolved in discussion with MNR, concerned
parties have an opportunity to formally request the Minister of the Environment to issue a Part II Order requiring the
project be subject to an Individual Environmental Assessment (IEA) under the Environmental Assessment Act. As
this decision rests with the Minister of Environment, please direct your inquiries in this regard to the Minister at the
following address, and copy to MNR and TH Energy, before the end of the 30 calendar day review period (May 14,
2009):
Minister of the Environment
135 St. Clair Avenue
10th Floor, Toronto, ON M4V 1P5
If MNR considers there are no significant outstanding concerns by the end of the 30-calendar day review period, the
MNR may permit the implementation of the undertaking without further public notice.
In addition to the MNR EA requirements, the proposal is also subject to the Canadian Environmental Assessment Act
(CEAA), as it is anticipated that a federal trigger will occur. A CEAA Screening may take place to seek formal
Federal approvals.
Yours very truly,
TORONTO HYDRO CORPORATION
Joyce McLean
Director, Strategic Issues
cc: I. Dobrindt, AECOM
M. Patterson, Ministry of Natural Resources
Proposed Boundary for Applicant of Record Status including Land Use Permit Location
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment